Laredo, TX Building Permit Fees (2026)

Actual residential building permit fees from the City of Laredo Code of Ordinances, Chapter 7 (Buildings and Building Regulations), Section 109.2 Schedule of Permit Fees. Laredo is the seat of Webb County and the largest city on the Texas-Mexico border, on the Rio Grande across from Nuevo Laredo. Verified directly against the city's codified ordinance. Because the fee table carries no single printed effective date, confirm the latest amendment with Building Development Services before budgeting.

Jurisdiction
Laredo, TX (Webb County)
Permit Type Covered
Building permit (residential)
Coverage Scope
Per-SF new construction; flat fees for most home projects
Fee Schedule Effective
Codified ordinance (Ch. 7 § 109.2) - no printed date; Ch. 7 last amended 2024
Last Verified
October 28, 2026
Fee Status
Official codified schedule - no printed effective date, verify current
What This Page Covers - and What It Does Not

This page covers: The residential building permit fees in Section 109.2 of the Laredo Code of Ordinances - $0.40 per square foot for new construction; flat remodel/addition fees of $64 (up to 1,000 sq ft), $73 (1,001-2,000 sq ft), and $76 (2,001 sq ft and up); a $64 swimming pool permit; $64 for open accessory structures (porches, palapas, carports) or an enclosed detached storage room; a $46 block fence; a $50 re-roof; a $50 residential demolition (0-100,000 cubic feet); and a $50 administrative fee for a building-site, setback, and zoning inspection. Each figure is exact from the codified schedule.

Plan-checking (plan review) fees are separate line items: Section 109.2 lists a separate residential plan-checking fee - $30 for a block fence and $34 for a re-roof are confirmed. The full residential plan-checking table for other project types is not reproduced here (it was not fully captured from the codified source), so where a plan-check fee is not shown it is not included and not estimated - confirm it with Building Development Services.

Whether trades are separate is not confirmed: The $0.40/sq ft new-construction rate appears to be a building-permit-only figure. Section 109.2 does not state whether electrical, mechanical, and plumbing work on a new home is billed as separate permits, so new-home totals here cover the building permit line only and do not add trades.

A flat $20 technology fee applies to every residential permit: City of Laredo Ordinance No. 2024-O-247 (amending Code Sec. 7-2, effective 60 days after its October 28, 2024 public hearing) assesses a $20.00 technology fee on every residential permit. Totals on this page add it once for the single permit shown; a project that needs more than one permit (for example a separate electrical permit) may pay it on each. Unlike Virginia or Maryland, Texas adds no statewide percentage building-permit levy, and there is no percentage add-on to a Laredo permit.

This page does NOT cover: Zoning and platting/subdivision fees, impact fees, utility (water and wastewater) connection fees, and any stand-alone trade-permit fees not printed in Section 109.2 - all excluded from every figure on this page. Commercial building permits use a separate valuation-tiered schedule, summarized below but not the focus of this residential page.

Key Takeaways
  • New residential construction is $0.40 per square foot, so a 2,000 sq ft home's building permit is $800.00 ($820.00 with the $20 technology fee). The $0.40/sq ft rate appears to be building-permit-only; the schedule does not state whether trades are bundled, so no trade fees are added to that figure on this page.
  • Remodels and additions are flat fees by size, not a per-square-foot rate: $64 up to 1,000 sq ft, $73 for 1,001-2,000 sq ft, and $76 for 2,001 sq ft and up. That makes Laredo one of the least expensive Texas cities for a mid-size remodel permit.
  • Common flat fees: swimming pool $64, block fence $46, re-roof $50, open accessory structure (porch, palapa, carport) $64, enclosed detached storage room $64, and residential demolition $50 (0-100,000 cubic feet). A block fence adds a $30 plan check ($96 all-in with the $20 technology fee) and a re-roof adds a $34 plan check ($104 all-in).
  • A $50 administrative fee covers a building-site, setback, and zoning-regulation inspection, and moving a building is $50. Ordinance No. 2024-O-247 adds a flat $20.00 technology fee to every residential permit. Texas has no statewide levy and there is no percentage add-on to a Laredo permit.
  • The fees come from the City of Laredo Code of Ordinances (Chapter 7, Section 109.2), a current codified schedule that carries no single printed effective date. Chapter 7 was last amended in 2024 (Ordinances 2024-O-152 and 2024-O-247). Confirm current amounts and the latest amendment with Building Development Services (956-794-1625). Zoning, platting, impact, and utility fees are separate and NOT included in any figure here.

Laredo Building Permit Fee Structure

Laredo prices a new-construction building permit per square foot and prices most other residential work as flat fees by project type. A separate residential plan-checking fee applies to some project types. The tables below show the verified figures exactly as printed in the codified Section 109.2 schedule.

Residential building permit fees

Project type Fee
New residential construction$0.40 / sq ft
Remodel or addition - up to 1,000 sq ft$64.00 flat
Remodel or addition - 1,001 to 2,000 sq ft$73.00 flat
Remodel or addition - 2,001 sq ft and up$76.00 flat
Swimming pool$64.00 flat
Open accessory (porch, palapa, carport)$64.00 flat
Enclosed accessory (detached storage room)$64.00 flat
Block fence$46.00 flat
Re-roof$50.00 flat
Residential demolition (0-100,000 cu ft)$50.00 flat
Administrative / site, setback & zoning inspection$50.00 flat
Moving a building$50.00 flat

Demolition over 100,000 cubic feet is $0.50 per 1,000 cubic feet. The $0.40/sq ft new-construction rate is a building-permit line; Section 109.2 does not state whether electrical, mechanical, and plumbing work is bundled or billed as separate permits. Every residential permit also carries a flat $20.00 technology fee (Ordinance No. 2024-O-247, Code Sec. 7-2), shown in the components table below. Texas has no statewide levy.

Residential plan-checking (plan review) fees

Project type Plan-check fee
Block fence$30.00
Re-roof$34.00
Other residential project typesNot shown - confirm with the department

Section 109.2 charges a residential plan-checking fee in addition to the building permit fee. Only the block-fence ($30) and re-roof ($34) plan-check rows are reproduced here; the remaining residential plan-check rows are not shown and are not estimated. Where no plan-check fee is listed for a project on this page, treat it as unconfirmed and verify with Building Development Services before budgeting.

Commercial building permit fees (valuation-tiered)

Project valuation Building permit fee
$1,000 and lessNo fee (unless an inspection is required: $50/inspection)
$1,001 - $50,000$50 for the first $1,000 + $4 per additional $1,000 (= $260 at $50k)
$50,001 - $100,000$260 + $3 per $1,000 (= $360 at $100k)
$100,001 - $500,000$360 + $2 per $1,000 (= $1,160 at $500k)
$500,001 - $1,000,000$1,160 + $1 per $1,000 (= $1,660 at $1M)
$1,000,001 and up$1,660 + $0.50 per $1,000

Commercial plan-checking is one-half of the building permit fee (a newer commercial workflow prices plan check at a flat $200 / $300 / $400 by valuation band). Commercial project valuation is set under Section 108.3, which is not reproduced here. This residential page focuses on the flat and per-square-foot residential fees above.

Laredo Permit Fee Components

A Laredo residential permit total is short: the building permit fee (per-square-foot for new construction, otherwise a flat fee), plus a separate residential plan-checking fee for some project types, plus a flat $20.00 technology fee on every residential permit. There is no percentage surcharge and no statewide levy. Zoning, platting, impact, and utility fees sit outside this stack entirely.

Component Amount Status
Building permit fee $0.40/SF (new construction), or a flat fee ($46-$76) by project type Exact schedule figure
Residential plan-checking fee $30 block fence / $34 re-roof; other types not shown Separate line; only two rows confirmed
Trade permits (electrical, mechanical, plumbing) Not stated in Section 109.2 Unconfirmed - whether new-home trades are separate is not printed
Technology fee $20.00 per residential permit Exact - Ordinance No. 2024-O-247 (Code Sec. 7-2)
Statewide levy $0.00 Texas has no statewide building-permit levy
Zoning / platting / impact / utility fees Separate schedules Excluded - not part of the Section 109.2 permit fee

The components that stack on a Laredo residential permit are the building permit fee, the flat $20.00 technology fee, and, for some project types, a separate plan-checking fee. There is no percentage surcharge and no statewide levy. Because Section 109.2 does not state whether new-home trade work is billed separately, new-construction totals on this page cover the building permit line only.

Worked Examples

Every figure below is direct arithmetic from the codified Section 109.2 schedule. Building-permit, flat-fee, and $20.00 technology-fee figures are exact (the technology fee is from Ordinance No. 2024-O-247). Where a residential plan-checking fee is not printed for a project type, it is not added and the total is labeled a building-permit line only.

Example 1: New 2,000 SF Single-Family Home

Fee Calculation - New 2,000 SF Home in Laredo, TX
Fee Component Rule Applied Amount
Building permit 2,000 SF × $0.40 $800.00
+ Technology fee flat, every residential permit $20.00
Building permit + technology fee (exact) $800.00 + $20.00 $820.00
+ Residential plan check not shown for new construction Not estimated
+ Trade permits bundling not stated Not estimated

Assumptions: 2,000 SF home. Building permit $0.40/SF = $800.00, plus the $20.00 technology fee = $820.00 - exact figures for the building permit line. Section 109.2 does not print a residential plan-checking fee for new construction and does not state whether electrical, mechanical, and plumbing work is billed as separate permits, so neither is added here. Zoning, platting, impact, and utility fees are separate and not included. Confirm the plan-check and trade treatment with Building Development Services. Sources: City of Laredo Code of Ordinances, Ch. 7 § 109.2; Ordinance No. 2024-O-247 (technology fee).

Example 2: 500 SF Remodel or Addition

Fee Calculation - 500 SF Remodel/Addition in Laredo, TX
Fee Component Rule Applied Amount
Remodel / addition permit up to 1,000 SF = flat $64.00
+ Technology fee flat, every residential permit $20.00
Building permit + technology fee (exact) $64.00 + $20.00 $84.00

Assumptions: A remodel or addition bills a flat fee by size: $64 up to 1,000 sq ft, $73 for 1,001-2,000 sq ft, and $76 for 2,001 sq ft and up. A 500 SF project is in the first tier, so the building permit is exactly $64.00, or $84.00 with the $20.00 technology fee. A residential plan-check fee for a remodel is not printed in the captured schedule and is not added. Any electrical, mechanical, or plumbing work is handled under the city's separate trade provisions. Source: City of Laredo Code of Ordinances, Ch. 7 § 109.2.

Example 3: Flat-Fee Projects - Pool, Block Fence, Re-Roof

Fee Calculation - Flat-Fee Residential Permits in Laredo, TX
Project Building permit + plan check + $20 technology fee All-in total
Swimming pool $64 + $20 (plan check not shown) $84.00 before plan check
Block fence $46 + $30 plan check + $20 $96.00
Re-roof $50 + $34 plan check + $20 $104.00

Assumptions: The block fence and re-roof each add a printed residential plan-checking fee, and every residential permit carries the $20.00 technology fee, so their all-in figures are exact: block fence $46 + $30 + $20 = $96.00, re-roof $50 + $34 + $20 = $104.00. The swimming pool is $64.00 + $20.00 = $84.00 before any plan check; a residential plan-check fee for a pool is not printed in the captured schedule, so it is not added - confirm it with Building Development Services. Pool electrical and safety-barrier requirements are handled separately. Sources: City of Laredo Code of Ordinances, Ch. 7 § 109.2; Ordinance No. 2024-O-247 (technology fee).

Example 4: Residential Demolition

Fee Calculation - Residential Demolition in Laredo, TX
Fee Component Rule Applied Amount
Demolition permit 0 to 100,000 cubic feet $50.00
+ Technology fee flat, every residential permit $20.00
All-in total (exact) $50.00 + $20.00 $70.00

Assumptions: A typical single-family house is well under 100,000 cubic feet, so the residential demolition permit is a flat $50.00, or $70.00 with the $20.00 technology fee. Above 100,000 cubic feet the fee is $0.50 per 1,000 cubic feet. Utility disconnections and any asbestos survey are handled separately and are not part of this fee. Sources: City of Laredo Code of Ordinances, Ch. 7 § 109.2; Ordinance No. 2024-O-247 (technology fee).

Read before you budget from these examples

  • New-home total is a building-permit line only: $820 for a 2,000 SF home ($800 permit + $20 technology fee) is exact for the building permit, but Section 109.2 does not print a residential plan-check fee for new construction and does not say whether trades are separate, so neither is added.
  • Only two plan-check rows are confirmed: block fence $30 and re-roof $34. Where a plan-check fee is not shown (pool, new construction, remodel), it is not estimated - confirm with the department.
  • $20 technology fee per permit, no levy: Ordinance No. 2024-O-247 adds a flat $20.00 technology fee to every residential permit; each total above includes it once. A project that needs several permits may pay it on each. Texas has no statewide building-permit levy and there is no percentage add-on.
  • Codified schedule, no printed date: the fee table carries no single effective date. It is the current codified version (Chapter 7 last amended in 2024); confirm the latest amendment before relying on any figure.
  • Excluded fees are separate: zoning, platting/subdivision, impact, and utility connection fees are separate schedules and not in any total above.

Practitioner Insight

Laredo's residential permit fees are among the lowest verified in the Texas set. New construction is $0.40 per square foot - below San Marcos ($0.66/sq ft) and well under most metros - and a remodel or addition is a flat $64 to $76 regardless of value. For a homeowner adding a room or finishing a space, that is a $64 permit where a value-based city could charge several times more. Down on the coast and in the Rio Grande Valley, Corpus Christi, McAllen, and Brownsville price new construction per square foot too, so Laredo reads naturally alongside the South Texas cities.

Two cautions. First, the schedule is a codified ordinance with no single printed effective date - it is the current version (Chapter 7 was amended twice in 2024), but there is no "adopted on" line to point to, so confirm the latest amendment before you file. Second, the residential plan-checking table is only partly reproduced here: block fence ($30) and re-roof ($34) are confirmed, but the plan-check fees for a pool, a remodel, or new construction are not shown and are not estimated on this page. For the two projects where the plan-check row is confirmed, the all-in is exact - see the Laredo fence permit guide ($96) and the Laredo roof permit guide ($104), both including the $20 technology fee. For everything else, treat the plan-check line as unconfirmed and call Building Development Services.

Permit Requirements - Common Residential Projects in Laredo

Project Type Permit Required? Fee Category Notes
New single-family home Yes $0.40/SF 2,000 SF = $800 building line + $20 technology fee; trades/plan check not stated
Addition Yes $64 / $73 / $76 flat by size ≤1,000 / 1,001-2,000 / 2,001+ sq ft tiers
Interior remodel Yes $64 / $73 / $76 flat by size Same flat-by-size schedule as additions
Swimming pool Yes $64 flat + $20 technology fee; pool plan check not shown; electrical/barrier separate
Block fence Yes $46 + $30 plan check + $20 $96 all-in (exact)
Re-roof Yes $50 + $34 plan check + $20 $104 all-in (exact)
Accessory structure (porch, palapa, carport, storage room) Yes $64 flat Open or enclosed detached accessory
Demolition (residential) Yes $50 flat 0-100,000 cu ft; above that $0.50 per 1,000 cu ft

Permit trigger thresholds, height and setback rules for fences, pool safety-barrier requirements, and which square footage counts for a project are set by the City of Laredo Building Development Services. When uncertain whether a permit is required, contact the department before starting work.

City of Laredo Building Development Services

Department

Building Development Services

City of Laredo · confirm the current counter address with the department

Contact

Building Development Services: (956) 794-1625

Online permits: Click2Gov portal (lare-egov.aspgov.com)

Fee Schedule

Code of Ordinances, Ch. 7 § 109.2

Codified schedule · no printed effective date · Ch. 7 last amended 2024

Verify with your local building department before budgeting or filing. The fees on this page are from the City of Laredo Code of Ordinances, Chapter 7, Section 109.2, a codified schedule with no single printed effective date. Fees are set by ordinance and can change by amendment - verify directly with City of Laredo Building Development Services at (956) 794-1625 before treating any total here as final, and confirm the residential plan-checking fee for your specific project.

When This Estimate May Not Apply

The schedule carries no printed effective date

Section 109.2 is a codified ordinance with no single "adopted on" date on the fee table. It is the current codified version and Chapter 7 was amended in 2024 (Ordinances 2024-O-152 and 2024-O-247), but confirm the latest amendment with Building Development Services before relying on any figure.

You need the residential plan-check fee for a project other than a fence or re-roof

Only the block-fence ($30) and re-roof ($34) plan-check rows are reproduced here. The plan-check fee for a pool, a remodel, or new construction is not shown and is not estimated on this page - confirm it with the department before budgeting.

You are building a new home and need a full permit package

The $0.40/sq ft rate is a building-permit line. Section 109.2 does not state whether electrical, mechanical, and plumbing work is billed as separate permits, so a full package could exceed the $800 building line. Zoning, platting, impact, and utility connection fees are separate and can be large.

Your project is commercial

Commercial building permits use the separate valuation-tiered schedule summarized above, with commercial plan-checking at one-half of the building permit fee. Commercial valuation is set under Section 108.3, which is not reproduced here.

The ordinance is amended

Chapter 7 fee provisions are amended from time to time by city ordinance. Confirm the current codified amounts on the Municode code library or with Building Development Services before filing.

Source note: All figures come from the City of Laredo Code of Ordinances, Chapter 7 (Buildings and Building Regulations), Section 109.2 Schedule of Permit Fees, hosted on the official Municode code library. The codified text was captured on June 13, 2026 by rendering the Municode viewer. The fee table carries no single printed effective date, so it is treated as the current codified schedule; the city's ordinance page references 2024 amendments (2024-O-152, 2024-O-247), indicating the fee provisions were last amended in 2024. The $20.00 residential technology fee comes from Ordinance No. 2024-O-247 (amending Code Sec. 7-2; effective sixty days after the October 28, 2024 first public hearing), read from the signed ordinance on cityoflaredo.com on October 28, 2026. The complete residential plan-checking table was not fully captured - only the block-fence ($30) and re-roof ($34) rows are used here, and no other residential plan-check fee is estimated. Zoning, platting, impact, and utility fees are separate schedules and are not used in any worked-example total here.

Frequently Asked Questions

New residential construction is $0.40 per square foot, so a 2,000 sq ft home's building permit is $800.00. A remodel or addition is a flat fee by size ($64 up to 1,000 sq ft, $73 for 1,001-2,000 sq ft, $76 above that). A swimming pool is $64, a block fence is $46, and a re-roof is $50. Every residential permit also carries a flat $20 technology fee, so a block fence with its $30 plan check is $96 all-in and a re-roof with its $34 plan check is $104 all-in. Texas has no statewide levy.
Laredo charges a technology fee; Texas has no statewide levy. City of Laredo Ordinance No. 2024-O-247 (amending Code Sec. 7-2) assesses a flat $20.00 technology fee on every residential permit, effective sixty days after its October 28, 2024 public hearing. Texas has no statewide percentage building-permit levy. The other line that can be added is the separate residential plan-checking fee for certain project types (for example, $30 for a block fence and $34 for a re-roof). Zoning, platting, impact, and utility fees are separate site charges, not permit surcharges.
Section 109.2 does not say. The $0.40/sq ft new-construction rate appears to be a building-permit-only figure, and the ordinance section does not state whether trade work is bundled or billed as separate permits. Because it is not confirmed, the new-home totals on this page cover the building permit line only and do not add trades - verify the trade treatment with Building Development Services at (956) 794-1625.
Laredo prices remodels and additions as a flat fee by size, not a per-square-foot rate: $64 up to 1,000 sq ft, $73 for 1,001-2,000 sq ft, and $76 for 2,001 sq ft and up. A 500 sq ft addition is $64 and a 1,500 sq ft addition is $73. That flat structure makes Laredo one of the least expensive Texas cities for a mid-size remodel permit.
A block fence is $46 plus a $30 plan check and the $20 technology fee ($96 all-in) and a re-roof is $50 plus a $34 plan check and the $20 technology fee ($104 all-in) - both exact. A swimming pool is a $64 building permit plus the $20 technology fee ($84); a residential plan-check fee for a pool is not printed in the captured schedule, so it is not added and should be confirmed with the department. See the Laredo fence permit guide, roof permit guide, and pool permit guide for full walkthroughs.
They are from the current codified Laredo Code of Ordinances (Chapter 7, Section 109.2) on the official Municode library, captured June 13, 2026. The fee table carries no single printed effective date, so treat the amounts as the current codified version and confirm the latest amendment with Building Development Services. Chapter 7 was amended in 2024 (Ordinances 2024-O-152 and 2024-O-247; the latter adds the $20 residential technology fee, confirmed from the ordinance on October 28, 2026). Laredo's $0.40/sq ft new-construction rate is lower than San Marcos ($0.66/sq ft) and sits naturally alongside the South Texas cities of McAllen and Brownsville.

Sources

Official Sources · Verified October 2026
Next Step

Dig into a specific Laredo project, compare with nearby South Texas cities, or estimate fees in covered jurisdictions.

Texas Permit Fees Hub → Laredo Fence Permit Guide → Laredo Roof Permit Guide → Laredo Pool Permit Guide → McAllen Permit Fees → Brownsville Permit Fees → Corpus Christi Permit Fees → Permit Fee Calculator → Pasadena Roof Guide → Brownsville Roof Guide → All Texas Cities →

Permit Fees Are One Part of Your Project Budget

Once you know your Laredo permit cost, two related numbers round out your total budget picture:

Property tax impact after your project closes

A permitted addition or pool increases your assessed value in Webb County. A permitted project may change the property's taxable value. The county appraisal district determines that value and local taxing units adopt the rates, both separately from this permit fee.

Zoning, platting, and impact fees for larger projects

Zoning, platting/subdivision, impact, and utility connection fees in Laredo are separate from the building permit. These items are governed by fee schedules separate from the building permit and are not included in the figures above.

These charges are administered separately from the building permit fee, though the responsible office and billing process vary by jurisdiction. See which tool covers each charge →

Always verify current fees directly with City of Laredo Building Development Services before budgeting or filing. The fees on this page are from the Laredo Code of Ordinances, Chapter 7, Section 109.2, a codified schedule with no single printed effective date. Fee provisions can change by amendment - confirm the current amounts, the residential plan-check fee for your project, and whether trade work is billed separately with Building Development Services at (956) 794-1625 before you file.
Disclaimer: All fee information on PermitPrice is for informational purposes only and is an estimate, not an official permit quotation. Actual permit fees are determined by the City of Laredo Building Development Services at the time of application. The $0.40/sq ft new-construction rate, the flat remodel/addition fees ($64/$73/$76), the flat pool ($64), block fence ($46), re-roof ($50), accessory ($64), demolition ($50), and administrative ($50) fees, and the block-fence ($30) and re-roof ($34) residential plan-check fees shown are exact from the codified Section 109.2 schedule. The residential plan-check fees for other project types were not fully captured and are not estimated here. Whether new-home trade permits are separate is not stated in the ordinance. The schedule carries no single printed effective date; Chapter 7 was last amended in 2024. Zoning, platting/subdivision, impact, and utility connection fees are not included in any figure on this page. Verify all fees directly with Building Development Services before filing.